SH8 connects Timaru with the central South Island, mountains, lakes, canals and places like Tekapo, Mt Cook, Twizel and Geraldine which present further opportunities to outdoor activities. To prepare for the Alpine Energy moveable substation connection in Pleasant Point the 33kV line between Timaru and Pleasing Point was switched off. Infratec is a division of NETcon, specialized in last to last renewable energy. Visit our Library to view and download standards, policies, legal documents etc. Being a coastal town there are plenty of recreational areas along the waterfront like Caroline Bay beach including the Aquatic center, a healthy established bay area including rose garden and aviary, as healthy as walking and biking tracks and a surf beach. NETcon offers a expansive range of professional services to distribution lines companies, industry and consumers, including overhead, underground and earthing services.
Infratec is a division of NETcon, specialized in final to final renewable energy. NETcon s distribution team recently completed a large project in the Lofty Country. Following months of detailed planning, the power was switched off in the Mt Cook and Braemar Road areas for 16 hours to allow Transpower to carry out essential upgrades to their Tekapo substation. Infratec is a division of NETcon, specialized in last to final renewable energy.
Two trailer mounted generators were old to boost the 11kV line for Pleasant Point and surrounding areas to bear consecutive electricity supply. Considerable months of planning and preparation resulted in a thriving operation between Alpine Energy and NETcon. Over 20 staff from NETcon’s distribution and technical teams were involved in this project. The substation has been equipped with connection points for a mobile substation.
A team from NETcon’s Technical Services Department, made up of technicians, electrical fitters and line mechanics, were based in Tekapo for two days monitoring the generators 24 7 and making safe there was a constant supply of power