Infodats New Zealand

Netcon Ltd
Telecom in Timaru

www.netcon.co.nz
Show phone number
Remember you found this company at Infodats (03) 683930?

Address

31 Meadows Road. 7910, Timaru, Canterbury.
Show map


Are you the owner or manager of this company?



What you should know about Netcon Ltd

Engineering in Timaru, Engineers in Timaru, Communication in Timaru

A shipping container of goods bound for quake stricken Kaikoura is rapidly filling up. Infratec is a division of NETcon, specialized in final to end renewable energy. A changeable substation is a fully equipped electrical substation which is mounted on a trailer and can be easily moved to the needed location. NETcon specialisms in design, construction and maintenance for all your electrical management and supply requirements. The company’s experienced team deployed Alpine Energy’s two large trailer mounted 900kVA generators to Tekapo to bear electricity for residents, businesses and tourists during the two day disconnect from the national grid.
SH8 connects Timaru with the central South Island, mountains, lakes, canals and places like Tekapo, Mt Cook, Twizel and Geraldine which present further opportunities to outdoor activities. To prepare for the Alpine Energy moveable substation connection in Pleasant Point the 33kV line between Timaru and Pleasing Point was switched off. Infratec is a division of NETcon, specialized in last to last renewable energy. Visit our Library to view and download standards, policies, legal documents etc. Being a coastal town there are plenty of recreational areas along the waterfront like Caroline Bay beach including the Aquatic center, a healthy established bay area including rose garden and aviary, as healthy as walking and biking tracks and a surf beach. NETcon offers a expansive range of professional services to distribution lines companies, industry and consumers, including overhead, underground and earthing services.
Infratec is a division of NETcon, specialized in final to final renewable energy. NETcon s distribution team recently completed a large project in the Lofty Country. Following months of detailed planning, the power was switched off in the Mt Cook and Braemar Road areas for 16 hours to allow Transpower to carry out essential upgrades to their Tekapo substation. Infratec is a division of NETcon, specialized in last to final renewable energy.
Two trailer mounted generators were old to boost the 11kV line for Pleasant Point and surrounding areas to bear consecutive electricity supply. Considerable months of planning and preparation resulted in a thriving operation between Alpine Energy and NETcon. Over 20 staff from NETcon’s distribution and technical teams were involved in this project. The substation has been equipped with connection points for a mobile substation.
A team from NETcon’s Technical Services Department, made up of technicians, electrical fitters and line mechanics, were based in Tekapo for two days monitoring the generators 24 7 and making safe there was a constant supply of power

Social media

Photos and videos

This business has no pictures or videos

Reviews of Netcon Ltd (0)

Do you own a business?
We help you grow it

Get more clients, visibility and branding.
Let us help you achieve your targets and improve your business.

Add your company